Import Room Assignments (SynXis/SPM) (MOP 2.0)

Import Room Assignments (SynXis/SPM) (MOP 2.0)

When connected with SynXis, the rooms are first assigned to each housekeeper in the PMS and then imported in MOP. Because of the 2way connection between MOP and SynXis, if a room is checked out of the PMS or if a room status changes in MOP from dirty to clean, the status updates accordingly in one another.
Path: Dashboard > Add Tasks

1. Assign rooms in SynXis.
2. View assignments created in SynXis.



3. This will show the previous day assignments.



4. Click "Add Synxis Tasks".



5. If the import is successfull, you will receive a notification that X (number of rooms assigned) SynXis tasks have been added.
6. If the import encountered any error, any room(s) not assigned in the importing process will be indicated with a red error "Error in Rooms Status Sync. The following Rooms Are Not Assigned". Rooms that reflect as an error can be manually assigned in MOP.

    • Related Articles

    • Import Room Assignments (SynXis/SPM) (1.0)

      When connected with SynXis, the rooms are first assigned to each housekeeper in the PMS and then imported in MOP. Because of the 2way connection between MOP and SynXis, if a room is checked out of the PMS or if a room status changes in MOP from dirty ...
    • Import Room Assignments (SynXis Property Hub/SPH) (MOP 2.0)

      When connected with SynXis Property Hub (SPH), the rooms are first assigned to each housekeeper in the PMS and then imported in MOP. Because of the 2way connection between MOP and SPH, if a room is checked out of the PMS or if a room status changes ...
    • Import Room Assignments (SynXis Property Hub/SPH) (1.0)

      When connected with SynXis Property Hub (SPH), the rooms are first assigned to each housekeeper in the PMS and then imported in MOP. Because of the 2way connection between MOP and SPH, if a room is checked out of the PMS or if a room status changes ...
    • Import Room Assignments from Visual Matrix (MOP 2.0)

      When integrated with Visual Matrix, room assignments are initially made to each housekeeper within the PMS and subsequently imported into MOP. Thanks to the two-way connection between MOP and Visual Matrix, any changes such as a room being checked ...
    • Import Room Assignments (Opera) (MOP 2.0)

      When connected with Opera PMS, the rooms are first assigned to each housekeeper in the PMS and then imported in MOP. Because of the 2way connection between MOP and Opera, if a room is checked out of the PMS or if a room status changes in MOP from ...