FAQ - Maintenance

FAQ - Maintenance

What is the difference between "Preventive" and "Preventative" Maintenance?
There’s no real difference — “preventive” and “preventative” mean the same thing: something designed to prevent or stop problems before they happen.
Why does the system say, “Work order must be assigned to an active maintenance” when I try to block a room?
You must assign the work order to an active maintenance user before saving it. Active maintenance users are those set up for the Engineering Department in Management > User Settings > Security.
How can I print a list of work orders to be completed?
The Work Order Analysis report is what you need. Start by selecting only the "Pending" work orders, and then filter by the maintenance person assigned to each work order, if desired. Once you've customized the list, you can print the report.
Alternatively, you may want to consider using MOP to eliminate the need for paper.
Can I close multiple work orders at once?
At this time, the Visual Matrix PMS does not support the ability to bulk close multiple work orders. Each work order is intended to be completed and closed individually, ensuring accurate tracking and accountability for every request.
We recognize that managing a backlog of open work orders can be time-consuming, and we’ve submitted a request for this feature to our Product Team for potential inclusion in a future update.
Can I view all currently open work orders, including the dates rooms were put out of order and their duration?
Yes, you can easily access this information by going to "Maintenance > Reports > Work Order Analysis." This report will provide a detailed overview of all open work orders, including the specific dates rooms were taken out of service and the length of time they remained out of order.
What could prevent me from assigning a work order
There are two common reasons you might be unable to assign a work order in the Room Rack:
- There are no active engineer user: You must have at least one active Maintenance person (engineer) set up in your User Settings. Go to Management > User Settings, and confirm there’s an active employee assigned to the Engineering department
- The Room already assigned to a reservation: If the room is booked for the same dates as the work order, you won’t be able to assign maintenance tasks to it. Verify that the room is available during the intended work order period before assigning.
Once both conditions are met, you should be able to create and assign work orders from the Room Rack without issue.

    • Related Articles

    • FAQ - Front Office / Reservations

      Why does the estimated total show $0 when creating a single reservation under a group name, whereas guests want to pay individually? This occurs when the group master reservation's Guarantee Type is set to Room and Tax or All Charges. To resolve ...
    • FAQ - VM Desktop PMS

      Secondary Backup Failed: What Does This Mean? The "Secondary Backup Failed" message means that the secondary drive has not been detected. Visual Matrix performs two backups every night—one before the audit and one after. To resolve this, ensure that ...
    • FAQ - Reports

      How many reports are available in Visual Matrix? Visual Matrix PMS offers over 120 reports, covering all key areas—from Front Office and Housekeeping to Maintenance, Accounting, Management, and even Marketing. You can access a complete list of ...
    • FAQ - Sales and Marketing

      Can we assign multiple rates to a company profile based on room type? While you can apply an override rate or discount code, or set up monthly or weekly rates for a company profile, the system does not allow assigning rates to specific room types. ...
    • FAQ - PMS Safety & Security

      Security in the hospitality industry is more than a best practice — it’s a vital guardrail for your guests, your staff, and your property’s operations. At Visual Matrix PMS, we build in robust safeguards to protect your system, but the strongest ...